


Model & Name | JK-DR180 |
Weight | 4500 kg |
Dimensions(mm) | 3800*1500*2200mm |
Power Oil | Diesel |
Rated Power | 55 kW |
Travelling System | Rubber Crawler |
Drilling depth | 180m |
Bore diameter | 140-254mm |
Drive Head Stroke | 3.4m |
Travelling speed | 2.5km/h |
Gradeability | 30% |
Rated pressure | 1.7-2.5MPa |
Air consumption | 17-31m³/min |
Drill rod diameter | Φ76,Φ89mm |
Drill rod length | 1.5m, 2.0m, 3.0m |
Elevating capacity | 12 Ton |
Swing speed | 45-65rpm |
Swing torque | 3200-4600 N.m |


1. The engine uses QUANCHAI 55 KW turbocharged engine;
2. Walking Type: crawler mounted ,trailer mounted for choice.
3. Hydraulic oil pump:Parallel gearbox design separates the oil pump unit, the power supply is adequately distributed, the hydraulic system is uniquely designed, and the maintenance cost is small;
4.Rotary head device:gearbox integrated casting, dual motor power, large torque, durable, low maintenance costs;
5.Drilling machine chassis:professional digging chassis, durable, heavy bearing, wide chain plate, less damage to hard roads;
6.Lifting force:design composite tower, 3.4m long stroke, double cylinder lift capacity 12 ton
7. Each rig is equipped with a relief valve to raise the boom to protect the cylinder and ensure work safety;
8. Each hydraulic oil pipe is covered with a protective jacket to make the oil pipe last longer.






